Skip to content
AccountancyPath

Management AccountingModule 3: Decisions, performance and FP&AIntermediate4 min read

Relevant Costing: Make-or-Buy, Special Orders & Bottlenecks

Identify sunk, avoidable and opportunity costs to make profitable make-or-buy, special order pricing and limiting-factor bottleneck decisions.

Lesson 8 of 12
Course outline (12 lessons)

Before this lesson:Cost Classification and BehaviourMulti-Product CVP Analysis

Suppose you bought a non-refundable $120 concert ticket and wake up with a heavy flu. Should you drag yourself to the stadium “so you do not waste the $120”? Of course not—the $120 is gone either way. The only things that matter now are future outcomes that differ between staying home and going.

That exact discipline is relevant costing. In short-term business decisions—outsourcing a component, pricing a one-off order or allocating scarce factory hours—full absorption costs often mislead because they bundle unavoidable historical overheads with real incremental cash flows.

The three tests of a relevant cost

A cost or revenue is relevant only if it passes all three filters:

  1. Future: Past spending is a sunk cost—ignore it completely (e.g., original purchase price of existing machinery or historical R&D).
  2. Cash flow: Non-cash accounting allocations like historical depreciation or redistributed head-office rent are irrelevant.
  3. Incremental (differential): It must change because of the decision. Costs that disappear if you stop an activity are avoidable (relevant); costs that continue either way are unavoidable (irrelevant).

Never forget opportunity cost—the net benefit of the best alternative you give up by choosing a course of action. Even though it never appears as an invoice in the ledger, it is a real economic cost.

Decision 1: Special order pricing

When a customer asks for a discounted one-off order and the factory has spare capacity, ignore normal fixed overhead allocations. Accept the order if:

  • Incremental Revenue > Incremental Variable Costs + Any Special Fixed Costs (e.g. custom tooling)
  • AND the discount will not cannibalise regular full-price customers.

If the factory is at full capacity, you must also add the opportunity cost (lost contribution margin from regular units displaced) to the minimum acceptable price.

Decision 2: Make-or-buy (outsourcing)

Worked example

Make-or-buy decision at Pinecrest Appliances (fictional)

Pinecrest Appliances, a fictional thermostat maker, currently builds 10,000 control modules per year internally at a reported absorption cost of $22/unit: direct materials $8, direct labour $6, variable overhead $3, and allocated factory fixed overhead $5.

An external supplier offers to supply all 10,000 modules for $19/unit ($190,000). Buying externally looks $3/unit cheaper on paper—until finance checks which fixed costs are actually avoidable. Only $10,000 of dedicated line supervision ($1/unit) would be eliminated; the other $40,000 of plant rent and depreciation continues either way.

Scenario A — Idle space has no alternative use:

  • Relevant internal cost to make = 10,000 × ($8 + $6 + $3) + $10,000 avoidable fixed = $180,000 ($18/unit).
  • Cost to buy externally = 10,000 × $19 = $190,000.
  • Decision: Keep making internally—outsourcing would actually reduce profit by $10,000.

Scenario B — Freed floor space can be subleased for $25,000/year (opportunity cost):

  • Relevant cost to make = $180,000 + $25,000 foregone rent = $205,000 ($20.50/unit).
  • Cost to buy externally = $190,000.
  • Decision: Buy externally—total company profit rises by $15,000 ($205,000 − $190,000).

Decision 3: Limiting factor (bottleneck) optimisation

When demand exceeds capacity in one scarce resource—machine hours, skilled engineers or raw materials—you cannot satisfy every order. Maximise total profit by ranking products on contribution per unit of the limiting factor.

Formula · Contribution per limiting-factor unit

Contribution per Bottleneck Unit = Product Contribution Margin per Unit ÷ Bottleneck Units Required per Product

Worked example

Allocating 900 bottleneck machine hours at Pinecrest Appliances

Pinecrest’s precision CNC machine has only 900 hours available this month, shared by two products:

Metric Product Alpha Product Beta
Contribution margin per unit $36 $30
CNC hours required per unit 3 hrs 2 hrs
Contribution per CNC hour $12/hr (Rank 2) $15/hr (Rank 1)
Maximum monthly demand 250 units (750 hrs) 300 units (600 hrs)
  • Optimal plan (Rank by $/CNC hour — Beta first): Produce all 300 units of Beta (600 hrs → $9,000 contribution), leaving 300 hrs for 100 units of Alpha (300 ÷ 3 = 100 units → $3,600 contribution). Total contribution = $12,600.
  • Naive plan (Rank by $/unit — Alpha first): Produce 250 Alpha (750 hrs → $9,000) + 75 Beta (150 hrs → $2,250). Total contribution = $11,250.

Ranking by bottleneck hour unlocks +$1,350 of extra profit from the exact same machine!

Real-world application

Airlines price last-minute empty seats just above incremental fuel and catering costs, manufacturers run make-or-buy models before shifting parts overseas, and consulting firms allocate senior partner hours using contribution per billable hour. In every case, stripping away sunk and unavoidable costs prevents managers from turning down profitable business—or outsourcing work that leaves fixed bills behind.

Recap

  • Relevant costs are future, incremental cash flows—plus any opportunity cost of displaced alternatives.
  • Ignore sunk costs and unavoidable allocated fixed overheads in short-term choices.
  • In make-or-buy decisions, compare external price against avoidable internal costs plus opportunity costs.
  • Under a capacity constraint, maximise profit by ranking products on contribution per bottleneck unit.

Active recall

Quick check · Test yourself

Work out each answer in your head first, then reveal the explanation and mark whether you got it right.

  1. 1A factory with spare capacity receives a one-off special order for 500 units at $28 each. Variable cost is $21/unit, custom tooling costs $2,000, and normal fixed overhead allocation is $10/unit (unchanged). Should the factory accept?

    Show worked answer

    Yes. Incremental revenue = 500 × $28 = $14,000. Relevant incremental costs = (500 × $21) + $2,000 = $12,500. The $10/unit allocated fixed overhead is unavoidable and irrelevant. Accepting adds +$1,500 to operating profit.

  2. 2You already paid $50,000 for custom software that now does not fit your workflow. Why is that $50,000 irrelevant to deciding whether to switch to a better system?

    Show worked answer

    The $50,000 is a sunk cost—cash already spent that cannot be recovered regardless of which path you pick. Only future cash outflows, savings and opportunity costs should drive the decision.

  3. 3When a factory has a scarce machine bottleneck, why should it rank products by contribution per machine hour rather than contribution per unit?

    Show worked answer

    Total profit is constrained by the scarce resource, not by unit count. A product earning $30 in 2 hours ($15/hour) generates more profit per hour of bottleneck time than a product earning $36 in 3 hours ($12/hour).

Key terms in this lesson

Lesson 8 of 12 · Management Accounting

Finished this lesson?

Mark it complete to track your progress through the course. Progress is saved in this browser only.

Previous lesson: Standard Costing and Variance Analysis

Subject GuideManagement Accounting & Corporate Finance

Elena Morales

Bridges internal factory numbers and boardroom valuation models step by step.

  • Costing & Variance Analysis
  • FP&A Forecasting
  • WACC & DCF Valuation

More lessons with Elena

Published:

Educational content only—not accounting, tax, legal or investment advice. See our editorial policy or report an error via our corrections policy.

Search