Assigning direct materials and direct labour to a product is straightforward: you weigh the steel and clock the assembly hours. The hard part of product costing is overhead—rent, machine setups, quality checks, scheduling and engineering. How a company collects costs and spreads overhead determines whether managers know which products actually make money.

Job costing vs process costing

First, companies choose a cost accumulation system that matches how work flows through operations:

  • Job costing tracks costs separately for each distinct order, project or batch. A commercial construction firm, an audit engagement or a custom machine shop opens a job cost sheet for every client order and charges actual materials, labour and applied overhead to that specific job.
  • Process costing applies when identical units flow continuously through standardised stages—such as paint manufacturing, oil refining or flour milling. Rather than tracking one litre of paint, accountants accumulate total costs per department for the month and divide by equivalent units produced to get an average unit cost.
Dimension Job Costing Process Costing
Output type Custom, distinct orders or batches Homogeneous, mass-produced units
Cost accumulation By individual job or client project By production department or process
Unit cost calculation Total job cost ÷ Units in the job Total department cost ÷ Equivalent units
Examples Yacht building, legal cases, bespoke furniture Cement, breakfast cereal, chemicals

Why traditional overhead allocation breaks down

Traditional costing pools all factory overhead into one bucket and divides it by a single volume measure—usually direct labour hours or machine hours. That worked well a century ago when factories made one or two products and manual labour dominated costs.

Modern operations look different: automation has shrunk direct labour, while product variety has exploded. A specialty product made in tiny batches may require frequent machine changeovers, extra quality inspections and custom engineering—activities that bear almost no relationship to direct labour hours.

How Activity-Based Costing (ABC) fixes distortion

Activity-Based Costing (ABC) follows a simple intuition: products do not consume overhead directly; products consume activities, and activities consume resources. Instead of one plant-wide rate, ABC builds a two-stage chain:

  1. Group indirect costs into activity cost pools (e.g., machine setups, quality inspections, order processing).
  2. Identify the cost driver that actually causes each pool to grow (e.g., number of setups, number of inspections, number of purchase orders).
  3. Calculate a driver rate for each pool and assign overhead to products based on actual driver usage.
Formula · ABC activity driver rate

Cost Driver Rate = Total Activity Cost Pool ÷ Total Cost Driver Volume

Worked example

Traditional costing vs ABC at Meridian Brassworks (fictional)

Meridian Brassworks, a fictional industrial-valve maker, produces 4,000 Standard valves and 1,000 Custom valves. Direct costs are $20/unit for Standard (0.5 labour hours each = 2,000 hours) and $34/unit for Custom (1.0 labour hour each = 1,000 hours). Total factory overhead is $90,000.

Step 1 — Traditional plant-wide rate (direct labour hours): Total labour hours = 2,000 + 1,000 = 3,000 hours. Overhead rate = $90,000 ÷ 3,000 = $30/hour.

  • Standard unit cost = $20 + (0.5 × $30) = $35.00
  • Custom unit cost = $34 + (1.0 × $30) = $64.00

Step 2 — Activity-Based Costing across three pools (totalling $90,000):

Activity Pool Pool Cost Driver Volume (Std / Custom) Driver Rate Standard OH Custom OH
Machine setups $45,000 10 / 40 (50 setups) $900/setup $9,000 $36,000
Quality inspections $30,000 20 / 80 (100 inspections) $300/inspection $6,000 $24,000
General machining $15,000 2,000 / 1,000 (3,000 hrs) $5/labour hr $10,000 $5,000
Total Overhead $90,000 $25,000 $65,000

Step 3 — Compare unit costs:

  • Standard valve: $20 + ($25,000 ÷ 4,000) = $20 + $6.25 = $26.25 (traditional overcosted it by $8.75/unit!)
  • Custom valve: $34 + ($65,000 ÷ 1,000) = $34 + $65.00 = $99.00 (traditional undercosted it by $35.00/unit!)

Notice that total factory cost is identical under both systems ($204,000)—ABC simply stops the Standard valve from secretly subsidising the Custom valve.

Real-world application

When Meridian Brassworks priced Custom valves at $80 using traditional costing ($64 apparent cost), managers celebrated a $16 profit per unit—when in reality every Custom valve was losing $19 ($80 − $99). Companies in manufacturing, logistics, healthcare and banking use ABC not just to reprice low-volume offerings, but also to redesign processes—such as cutting setup times or setting minimum order quantities so small orders stop eroding margins.

Recap

  • Job costing fits bespoke orders; process costing fits continuous, identical production.
  • Single plant-wide overhead rates systematically overcost simple, high-volume products and undercost complex, low-volume ones.
  • Activity-Based Costing assigns indirect costs through cost pools and cause-and-effect cost drivers.
  • Better overhead accuracy reveals hidden loss-makers and guides pricing, minimum batch sizes and process improvement.

Active recall

Quick check · Test yourself

Work out each answer in your head first, then reveal the explanation and mark whether you got it right.

  1. 1An ABC cost pool for machine setups totals $48,000 across 120 production batches. Product X required 15 batches to make 300 units. What is the setup overhead cost per unit of Product X?

    Show worked answer

    Cost driver rate = $48,000 ÷ 120 batches = $400 per batch. Total setup cost for Product X = 15 × $400 = $6,000. Setup cost per unit = $6,000 ÷ 300 units = $20.00.

  2. 2Would a bespoke kitchen builder and a bottled-water plant use job costing or process costing?

    Show worked answer

    The bespoke kitchen builder uses job costing because every kitchen is a distinct order with unique materials and labour hours. The bottled-water plant uses process costing because millions of identical bottles flow continuously through the same stages.

  3. 3Why does traditional labour-hour overhead allocation often overcost high-volume standard products?

    Show worked answer

    High-volume standard products accumulate the majority of direct labour hours, so a single plant-wide rate dumps most setup, inspection and engineering overhead onto them—even though complex, small-batch products trigger most of those support activities.

Key terms in this lesson

Lesson 3 of 12 · Management Accounting

Finished this lesson?

Mark it complete to track your progress through the course. Progress is saved in this browser only.

Previous lesson: Absorption vs Marginal Costing

Subject GuideManagement Accounting & Corporate Finance

Elena Morales

Bridges internal factory numbers and boardroom valuation models step by step.

  • Costing & Variance Analysis
  • FP&A Forecasting
  • WACC & DCF Valuation

More lessons with Elena

Published:

Educational content only—not accounting, tax, legal or investment advice. See our editorial policy or report an error via our corrections policy.

Search