Interactive LabManagement AccountingBusiness
Variance Analysis & Flexed Budget Lab
Examine a month of production at Alder Workshop, a fictional wooden desk manufacturer that budgeted to sell 1,000 desks for a $15,000 operating profit. Adjust actual sales volume, selling price, timber usage and price, labour hours and wages, and fixed overhead to watch the flexed budget and profit bridge reconcile static budget profit to actual profit down to the exact cent.
Live Interactive Sandbox · Runs 100% locally in your browser
Safe fictional data · Reset any timeTry a factory scenario (Alder Workshop)
Static budget: 1,000 desks @ $120 price, 4 kg timber @ $10/kg, 2 hrs labour @ $20/hr, $25,000 fixed overhead.
Static budget profit
$15,000
Planned for 1,000 desks
Flexed budget profit
$19,000
Re-scaled to 1,100 actual desks
Actual profit
$13,820
Reconciliation diff: $0.00
Total profit variance
-$1,180
Adverse (missed static budget)
Profit bridge waterfall (Static → Flexed → Actual)
Green = Favourable (F) · Rose = Adverse (A)What the profit bridge explains
Alder Workshop budgeted $15,000 on 1,000 desks and earned $13,820 on 1,100 desks (a total variance of -$1,180). Flexing the budget to actual sales volume raises the fair benchmark to $19,000. The biggest positive driver is Sales Volume Contribution Variance (+$4,000 F). The biggest drag on profit is Sales Price Variance (-$4,400 A).
Actual workshop performance
Static budget: 1,000 desks.
Budget standard: $120/desk.
Standard: 4.0 kg/desk (4,620 kg total vs 4,400 kg std).
Standard: $10.00/kg.
Standard: 2.0 hrs/desk (2,090 hrs total vs 2,200 hrs std).
Standard: $20.00/hr.
Budgeted fixed overhead: $25,000.
Complete profit reconciliation statement
Exact reconciliation: Static Budget + Sales Volume = Flexed Budget; Flexed Budget + Operating Variances = Actual Profit.
| Line item | Calculation | Amount | F / A |
|---|---|---|---|
| Static Budget Profit | 1,000 desks × $40 std contribution − $25,000 fixed OH | $15,000.00 | — |
| Sales Volume Contribution Variance | (1,100 − 1,000 units) × $40/unit std contribution | +$4,000 | F |
| Flexed Budget Profit | 1,100 desks × $40 std contribution − $25,000 fixed OH | $19,000.00 | — |
| Sales Price Variance | ($116.00 − $120.00) × 1,100 units | -$4,400 | A |
| Material Price Variance | ($10.00 − $9.50) × 4,620 kg | +$2,310 | F |
| Material Usage Variance | (4,400 − 4,620 kg) × $10.00/kg | -$2,200 | A |
| Labour Rate Variance | ($20.00 − $21.00) × 2,090 hrs | -$2,090 | A |
| Labour Efficiency Variance | (2,200 − 2,090 hrs) × $20.00/hr | +$2,200 | F |
| Fixed Overhead Expenditure Variance | $25,000 budget − $26,000 actual | -$1,000 | A |
| Actual Profit | Reconciled exactly (diff $0.00) | $13,820.00 | — |
Static vs flexed vs actual income statement
| Line | Static budget | Flexed budget | Actual | Flexed vs Actual |
|---|---|---|---|---|
| Desks sold (units) | 1,000 | 1,100 | 1,100 | 0 |
| Sales revenue | $120,000.00 | $132,000.00 | $127,600.00 | -$4,400 |
| Direct material | $40,000.00 | $44,000.00 | $43,890.00 | +$110 |
| Direct labour | $40,000.00 | $44,000.00 | $43,890.00 | +$110 |
| Contribution margin | $40,000.00 | $44,000.00 | $39,820.00 | -$4,180 |
| Fixed overhead | $25,000.00 | $25,000.00 | $26,000.00 | -$1,000 |
| Operating profit | $15,000.00 | $19,000.00 | $13,820.00 | -$5,180 |
Lab guide & concepts
How to use this lab
- Choose one of the four factory scenarios (Discounting for volume, Cheap poor-quality material, Overtime crunch, or On-budget baseline) to see realistic trade-offs across departments.
- Read the waterfall profit bridge from left to right: start at Static Budget ($15,000), step through Sales Volume to the Flexed Budget, and then trace all six operating variances to Actual Profit.
- Move any actual-performance slider on the right to isolate how price, efficiency and volume affect individual green (Favourable) and rose (Adverse) bars.
- Use the reconciliation table and the side-by-side income statement below the chart to verify every formula.
Key concepts and formulas
- Why Flex the Budget? Comparing actual costs for 1,100 desks against a static budget built for 1,000 desks compares apples with oranges. A flexed budget restates variable revenue and variable costs at standard rates for actual units sold, keeping fixed overhead unchanged. See fixed and variable costs and business budgeting.
- Sales Volume Contribution Variance:
(Actual Units − Budget Units) × Standard Contribution per Unit. At Alder Workshop, standard contribution is$120 − $40 material − $40 labour = $40/desk. - Sales Price Variance:
(Actual Price − Standard Price) × Actual Units. - Material Price & Usage Variances:Price =
(Std Price/kg − Actual Price/kg) × Actual kg; Usage =(Std kg for Actual Output − Actual kg) × Std Price/kg. - Labour Rate & Efficiency Variances:Rate =
(Std Rate/hr − Actual Rate/hr) × Actual Hours; Efficiency =(Std Hours for Actual Output − Actual Hours) × Std Rate/hr. - Fixed Overhead Expenditure Variance:
Budgeted Fixed Overhead − Actual Fixed Overhead.
What to experiment with
- See how variances interact across departments: Load Cheap poor-quality material. Purchasing earns a big favourable Material Price variance (+$5,750 F), yet factory scrap (-$6,000 A) and rework labour (-$4,000 A) drag total profit down by $4,250.
- Test a volume-vs-price trade-off: Load Discounting for volume, then nudge Actual Selling Price from $112 up to $114. At what selling price does selling 1,200 desks actually beat the $15,000 static budget?
- Verify exact reconciliation: Drag every slider to an extreme value and check the Reconciliation Statement — the sum of all seven variances always equals
Actual Profit − Static Budget Profitwith $0.00 difference.
Model simplifications and assumptions
- Alder Workshop is a fictional manufacturing model designed for learning marginal-costing variance analysis.
- All desks produced in the period are sold (no opening or closing work-in-progress or finished-goods inventory), and materials purchased equal materials used.
- Fixed overhead is analysed under marginal costing (expenditure variance only, with no fixed overhead volume/capacity absorption variance).
- Standards remain fixed at 1,000 budgeted desks, $120 price, 4 kg/desk @ $10/kg, 2 hrs/desk @ $20/hr, and $25,000 fixed overhead.
Deepen your margin intuition with the profit margin lesson.